Contact Us

Via On-line Form

Business Hours

Mon - Fri: 8:00 - 5:00

Call Us

1-360-832-8116

Backfill: A Simple Definition From Your Excavation Experts

Swick and Son backfill excavation foundation costs

The backfill process requires the use of heavy equipment as well as skill and experience. It also requires knowledge of the soil condition and contract requirements.

  •   Crawl spaces and wet basements are the most severe construction defects. They can lead to serious health implications as a result of mold.
  •   Backfilling helps protect foundations and other structures with a mixture of stones and soil.
  •   Improper backfilling procedures cause severe deficiencies in earthwork operations.
  •   Swick & Son is fully licensed and has the necessary equipment for large commercial projects.
  •   Backfilling requires skill, experience, and knowledge in soil conditions and contract requirements.

Backfill plays a vital role in the industry. It involves replacing or reusing removed soil during excavation and construction projects. This article will explain the importance of this process in simple terms.

Why Is Backfilling Important?

A sturdy foundation offers strength to the construction of a building. Backfilling plays a considerable role in creating a strong foundation that will last. The process plays a lot of significant parts in development and its aftermath. Backfilling protects walkways, roadways, foundations, as well as other structures. However, the backfill is not just soil. It is a mixture of stones, rocks, and dirt.

How Is Backfilling Done?

The backfilling process requires some considerations listed here:

  •   The foundation must be allowed to cure for five to seven days before backfilling. If done too soon, cracks will occur in the final construction project.
  •   The ground needs to be cleared of all rubbish, stones, grass, loose stones, etc. Water removal is a must as well.
  •   The combination and amounts of material for the backfill process is essential. Usually, a mixture of rocks, stones, and soil are the common materials used.
  •   Include some of the excavated soil in the refill process.
  •   When backfilling, ensure an even distribution of the soil. It helps to provide lateral support for the walls of the construction.
  •   Refill is layered correctly to ensure the integrity of the fill.
  •   Water each layer and compact it proper construction equipment

lowering dozer to backfill inside crawlspace

What Kind of Material Used For Backfill?

The types of materials used for backfill is the key to success.

  •   Coarse-grained soil: This includes sandy soils with gravel components
  •   Fine-graded soil: This includes fine sand with low plasticity
  •   Commercial by-products: Such by-products include fly ash or furnace slag backfill material. Such materials are essential when appropriate natural materials are not available.
  •   Controlled low strength material (CLSM): This material consists of sand, fly ash, cement, and water. It offers low-strength and self-compacting backfill that is flow-able.

It is best always to do the right thing from the beginning. Avoid costly construction defects when practicing the correct steps when preparing a site for construction. Wet basements and crawl spaces and cracks in structures are from poor site preparation.

Swick and Son are here for your construction excavation needs.